ADU Basics in Shoreline’s Innis Arden

January 1, 2026

Thinking about adding an accessory dwelling unit to your Innis Arden property? You’re not alone. Homeowners here want more flexibility, whether it’s space for family, a long-term rental, or a way to boost resale appeal. This guide covers the essentials you need to know in Shoreline so you can plan with confidence, avoid surprises, and move forward the right way. Let’s dive in.

What counts as an ADU in Innis Arden

An accessory dwelling unit is a secondary home on the same lot as your primary residence. In Shoreline, common ADU formats include:

  • Internal conversions: A basement or portion of the main house with its own entrance. Usually the most cost-effective and quickest to approve.
  • Attached ADUs: A new wing or second-floor suite connected to the main house. Moderate cost with simpler utility connections.
  • Detached ADUs (DADUs): A separate backyard cottage or carriage house. Highest design freedom and often the highest cost, with more siting considerations.
  • Garage conversions: Reusing an existing garage can be efficient but may trigger parking replacement requirements.
  • Junior ADUs (JADUs): Smaller units carved from existing space. Definitions and allowances vary, so verify whether Shoreline recognizes JADUs and how they are regulated.

Always confirm the latest City of Shoreline definitions and standards before you start design work.

Zoning, size, and siting in Shoreline

ADUs are often allowed in single-family zones, including neighborhoods like Innis Arden, but the details matter. Before you commit to a plan, confirm the following with the City of Shoreline’s permit staff and the municipal code:

  • Allowed zones: Verify your parcel’s zoning and any overlay districts that apply to Innis Arden.
  • Size limits: Many jurisdictions cap ADU square footage or tie it to a percentage of the main home. Check Shoreline’s current standards.
  • Height, setbacks, and lot coverage: Detached units often have separate rules. Tree protection and lot coverage limits can be significant on treed or smaller Innis Arden lots.
  • Critical areas and steep slopes: Parcels near drainage corridors, shorelines, or steep slopes may need reports, mitigation, or additional review that affects layout, cost, and timeline.
  • Parking: Some cities reduce or waive off-street parking for ADUs. Confirm Shoreline’s rules, and whether conversions are treated differently than detached ADUs.
  • Short-term rentals: Rules for short-term rentals can differ from long-term leases. Confirm whether short-term rental of an ADU is allowed in Shoreline and any licensing or tax requirements.

When in doubt, a quick call to the Shoreline Permit Center can clarify what’s feasible on your lot.

Permitting and timeline: what to expect

A practical ADU path in Shoreline usually looks like this:

  1. Pre-check
  • Review zoning, lot coverage, setbacks, and any critical areas using city resources. Ask staff how tree protection and stormwater rules could affect your site.
  1. Design and site planning
  • Choose the ADU type and outline a site plan showing the footprint, setbacks, parking and driveway approach, utilities, grading, and tree impacts. For detached units or sloped sites, bring in an architect or designer with local experience.
  1. Permit submittals
  • Zoning/land use review for siting and use confirmation.
  • Building permit with plans that meet structural and energy codes.
  • Mechanical, plumbing, and electrical permits as needed.
  • Critical area or shoreline permits if triggered by site conditions.
  • Tree permits or a tree protection plan if protected trees are impacted.
  1. Review and build
  • Typical Puget Sound timelines: pre-application and zoning checks can take 1 to 4 weeks, plan preparation can take weeks to months, permit review can run 2 to 8 or more weeks depending on complexity, and construction can range from several weeks to 6 months or longer. Critical area or shoreline review can extend schedules.
  • Expect inspections for foundation, framing, mechanical, plumbing, electrical, and final occupancy.

Design and utilities that matter on Innis Arden lots

In Innis Arden, trees, slopes, and drainage patterns often shape what is possible.

  • Utilities and capacity: Confirm water, sewer, and stormwater capacity and connection rules early. Extending or upsizing connections can impact budget and timing.
  • Metering: Decide whether to use shared or separate meters. This affects rental setup and can influence permitting.
  • Life-safety and accessibility: Meet egress, smoke and carbon monoxide alarm requirements, and minimum ceiling heights. If you’re planning for aging parents or long-term flexibility, consider step-free entries and wider doors.
  • Energy efficiency: Washington follows state energy codes. Insulation, windows, air sealing, and mechanical systems must meet current standards, which can influence design choices and costs.

Costs and financing: set a smart budget

Costs vary widely based on ADU type, site conditions, and finish level. Internal conversions typically fall on the lower end, while detached cottages tend to cost more due to new foundations, utilities, and site work. Local bids will give you the most accurate picture.

Key cost drivers to watch:

  • Slopes and grading, including retaining walls and erosion control.
  • Foundations on difficult soils or steep terrain.
  • Utility extensions and possible sewer lateral upgrades.
  • Driveway, parking, and drainage requirements.
  • Tree protection, removal, or mitigation if allowed.

Financing options to discuss with your lender:

  • Cash, savings, or portfolio reserves.
  • Home equity line of credit or home equity loan.
  • Construction-to-permanent or renovation loans.
  • Refinance-and-build approaches.
  • Personal construction loans or contractor-arranged financing.

Taxes and insurance:

  • An ADU typically increases your assessed value, which can raise property taxes. Contact the King County Assessor for estimates.
  • Talk to your insurer before renting. You may need an endorsement or a landlord policy, especially for detached units or short-term rentals.

Market and rental realities in Innis Arden

Innis Arden benefits from proximity to Seattle, Edmonds, and other job centers across the Seattle-Bellevue-Everett corridor. That often supports long-term rental demand. Keep these points in focus:

  • Long-term vs short-term: Different rules and tax obligations can apply. Confirm what is allowed and how to stay compliant.
  • Resale and appraisal: ADUs can enhance resale appeal, but value depends on design quality, integration with the lot, and documented income potential.
  • CC&Rs or neighborhood covenants: If applicable, review any private rules that could affect ADU design or use.

Two quick Innis Arden scenarios

  1. Basement conversion with separate entry
  • Likely the fastest path. Expect egress upgrades, sound insulation, and new mechanical or plumbing runs.
  • Check parking rules and whether you need to replace any lost spaces.
  • Typical permits include building, mechanical, plumbing, electrical, and inspections.
  1. Detached cottage on a sloped, treed lot
  • Plan for a geotechnical review if slopes are steep or soils are sensitive. Tree protection and stormwater management can shape the footprint and driveway alignment.
  • Expect a more complex plan set, possible critical area review, and a longer permitting timeline.

Homeowner checklist: start here

  • Confirm zoning and any overlays for your parcel with the City of Shoreline.
  • Ask about size limits, height, setbacks, and parking for your ADU type.
  • Screen for critical areas, steep slopes, and tree protection rules.
  • Get a recent site survey if your lot lines or elevations are unclear.
  • Engage an architect or designer early for detached units or sloped sites.
  • Consult at least two to three local contractors for bids and timelines.
  • Talk with a lender about financing and how your loan classifies the property.
  • Estimate tax impacts with the King County Assessor and update your insurance.
  • If renting, verify licensing, occupancy, and rental rules before you list.

What to bring to a pre-application conversation

  • Parcel map and legal description.
  • Recent survey and topography if available.
  • Photos of the proposed ADU location and access.
  • A rough site plan with setbacks, driveway layout, and tree locations.
  • A concept floor plan with basic dimensions.
  • Preliminary questions on size, parking, utilities, and any critical areas.

Final thoughts and next steps

An ADU in Innis Arden can be a smart way to create flexibility, support family, and potentially strengthen your property’s value. The most successful projects start with early due diligence, a realistic budget, and a design that respects Shoreline’s code, trees, and site context. If you are weighing whether to build, buy a home with an ADU, or position your property for sale, a local perspective can help you time the market and make informed decisions.

Have questions about ADU potential as part of a purchase or sale strategy in Shoreline and Edmonds-area neighborhoods? Reach out to Adam Cobb for tailored guidance.

FAQs

Are ADUs allowed in Innis Arden within Shoreline?

  • ADUs are commonly allowed in single-family zones, but you should confirm your parcel’s zoning, any overlays, and current standards with the City of Shoreline.

How big can an ADU be in Shoreline’s Innis Arden?

  • Size limits vary by municipality and may be capped by square footage or a percentage of the main home, so verify Shoreline’s current ADU standards before designing.

Do I have to live on-site if I add an ADU in Shoreline?

  • Owner-occupancy rules have evolved at the state level and can change locally, so check the latest City of Shoreline policy for your property.

Do I need off-street parking for an ADU in Shoreline?

  • Parking requirements are set by local code and may differ for conversions and detached units; confirm current rules with Shoreline’s permit staff.

Can I use my Innis Arden ADU for short-term rentals?

  • Short-term rentals are often regulated separately with licensing or tax requirements, so verify what is permitted for ADUs in Shoreline before listing.

How long do ADU permits and construction take in Shoreline?

  • Simple conversions can move faster, while detached units and critical-area reviews extend timelines; expect plan, permit, and build phases that can span months.

Will building an ADU in Shoreline raise my property taxes?

  • Adding living area typically increases assessed value, so contact the King County Assessor to estimate potential tax changes.

What if my Innis Arden lot has trees or steep slopes?

  • Protected trees and steep-slope buffers can trigger additional permits, reports, and mitigation, which may affect design, cost, and schedule.

Work With Us

With an unwavering commitment to client satisfaction, Adam's approach is both approachable and highly responsive, earning praise for his ability to exceed expectations. Let Adam Cobb and his team guide you through a seamless real estate experience. With us, your goals are always our priority, and our expertise is your advantage.